Richland Soil and Water

Although the office is closed to the public, when it comes to practices that can help keep our water and soil healthy, please turn to us at Richland SWCD. We are more committed than ever to providing you with good, solid information.

The next Board Supervisor meeting will be held Thursday, August  20 at 5:00 p.m. at the Longview Center, 1495 W. Longview Avenue, Suite 205B, Mansfield. If you wish to attend the meeting in person or via video conference, please contact Erica Thomas, District Program Administrator, at 419-747-8684 or thomas.erica@richlandswcd.net prior to the meeting so that enough meeting packets are prepared.  

You may reach us at RSWCD.Data@richlandswcd.net.

Face-to-face stormwater permit approval is temporarily suspended. Stormwater permit applications, checklists and information needed to obtain a stormwater permit are available at https://richlandswcd.net/services/water/stormwater/stormwater-documents-list

Please submit your stormwater permit application, site calculation form and additional documents via email to RSWCD.Data@richlandswcd.net or through US Mail by sending to: Richland SWCD, 1495 W. Longview Ave, Suite 205B, Mansfield, OH  44906.

Stormwater permit fees may be paid by check, payable to Richland SWCD and mailed to the Richland SWCD office. 

Agriculture Pollution Abatement concerns may be reported by calling (614) 265-6610.

We appreciate your understanding and patience during this difficult time. Be well!

TopsoilTopsoil is a valuable resource. In nature it can take over 500 years to form an inch so you do not want to waste what you have. Before excavation begins, the first step should be to have the topsoil stripped off any areas where digging will happen. The topsoil then should be stockpiled in an area where it can be retrieved when construction is complete. It can then be re-applied to all areas to be re-seeded. The new seeding will have a much better success rate if it is established in topsoil rather than unfertile sub-soil.